Skip to main content

prhp/DG10/34/11/RSEO

Our Ref
prhp/DG10/34/11/RSEO
Street Name
Grange Road
Town
Moffat
Post Code
DG10 9HT
Type of Order
RSEO
Repair Category
13(1)(a), 13(1)(b), 13(1)(c)
Decision Date
Members Names
R Handley, M Links, J Riach
Details
In particular the Private Rented Housing Committee requires the Landlord to:-(a) repair the roof of the extension at the rear of the Property to ensure that it is in proper working order ,(b) unblock the drain at the door of the extension and ensure that it is in proper working order ,(c) investigate the cause of the dampness in the external wall between the front door and the downstairs WC and carry out such works as are necessary to ensure that the dampness is eradicated and that the wall is water tight ,(d) investigate the cause of dampness in the internal wall in the upstairs bedroom and carry out such works are as necessary to ensure that the dampness is eradicated and that the Property is water tight ,(e) carry out such works are as necessary to ensure that the system for space heating and heating water within the Property is in proper working order and in a reasonable state of repair ,(f) provide the Tenant and the Committee with a valid Landlord's Gas Safety Certificate which relates to the system for space heating and heating water within the Property ,(g) make good any damage to the plasterwork and the decorations resulting from the remedial works carried out in accordance with this Order.The Private Rented Housing Committee order that the works specified in this Order must be carried out and completed within the period of six weeks from the date of service of this Notice.

File:

Document
rseo.34.11_0.pdf (429.38 KB)